Residential · Redondo Beach

Residential Remodeling in Redondo Beach

We work mostly on older homes — craftsmans, mid-century, and Spanish revivals — that need more than a cosmetic refresh. We figure out the structural, the systems, and the finishes so the result reads like the house was always meant to be this way.

Our home base. Redondo runs from walkable beach blocks to the hillside Hollywood Riviera, and the housing stock is just as mixed — older cottages, Spanish revivals, and newer townhomes all on the same street.

Open-concept kitchen remodel with white shaker cabinets, a stone-countered waterfall island, glass pendants, and stainless built-in refrigeration.

Building in Redondo Beach

We know the local ground.

Lots west of Pacific Coast Highway and near the water can fall in the Coastal Zone, which adds a review layer most remodels elsewhere skip. We read that early so it doesn't surprise the schedule.

  • Hollywood Riviera
  • South Redondo
  • North Redondo
  • the Avenues

What we do

Scope you can expect.

  • Kitchen remodels — design-assist or from your architect's drawings
  • Bath and shower remodels with custom tile, stone, and glass
  • Whole-home renovations on occupied or vacant homes
  • Outdoor living: pergolas, hardscape, fountains, fireplaces

Frequently asked

Common questions.

  • Do you take on residential projects in Redondo Beach?

    Yes. Redondo Beach is squarely in our South Bay service area, and residential work is one of our core services. Lots west of Pacific Coast Highway and near the water can fall in the Coastal Zone, which adds a review layer most remodels elsewhere skip. We read that early so it doesn't surprise the schedule.

  • Do you work with our architect or designer?

    Yes. We work with outside design teams every week and we're comfortable bidding from drawings. We can also recommend designers we trust if you don't have one yet.

  • What size projects do you take?

    Smallest is a full bathroom. Mostly $50k and up. Most of our work is full kitchens, baths, room additions, and whole-home renovations — bigger projects are where we shine.

  • How long does a typical kitchen remodel take?

    Plan on 8–14 weeks of construction once permits are pulled and materials are on order, depending on scope and structural changes.

Get a quote

Planning residential in Redondo Beach?

Free consultation. Honest answers about what's possible on your lot, what it costs, and how long it takes.